CanopiiCanopiiAll serversEnterprise →
io.github.theluckystrike/change-order

io.github.theluckystrike/change-order v0.21.0

Security Trust Score
Grade B · Moderate posture
Tier 1 · Public sourceHigh confidence · 90%
Declared MCP capabilities

Host io.github.theluckystrike/change-order in a governed environment — SSO in front, every tool call attributed and audited.

Reputation0stars0forks0open issuestodaylast commit<1yage

Security controls

Deterministic, evidence-backed. Score earned from passing controls; a failed guard caps it.

Model–MCP Runtime Guardrails

  • Warn
    Strict JSON Schema Enforcementschemas not strict

    Tool inputs are constrained (additionalProperties:false), so unexpected arguments can't be smuggled in.

    Fix: Set additionalProperties:false and require explicit parameters on every tool.

  • Pass
    Indirect Prompt Injection (IPI) Defensesguardno injection markers

    Tool/prompt/resource text is free of hidden instructions that could hijack the agent.

  • Pass
    User-in-the-Loop / Approval Scopeguardno destructive tool scope

    No over-broad or destructive tools (arbitrary shell, bulk-delete) that warrant human approval.

  • N/A
    Tool Definition Integrityguardno prior version to diff

    Every consecutive version pair is diffed for new injection markers or destructive scope — a risky diff anywhere in history is a rug-pull (fail, durable); benign description drift warns.

Application Security Checks

  • Warn
    No path traversalguard16 occurrences

    Naive path checks let tools read/write outside intended directories (EscapeRoute-class).

    billing/src/index.js:231billing/src/index.js:234billing/src/index.js:568billing/src/index.js:876

    Fix: Resolve to a canonical path and verify containment; reject ../ and symlinks.

  • Warn
    No SSRF sinksguard2 occurrences

    Fetching tool-supplied URLs can pivot into internal networks and metadata services.

    billing/src/index.js:543bundles/price-tracker/server/fetch.js:36

    Fix: Allow-list destinations; reject arbitrary/loopback/link-local URLs.

  • Warn
    Dependencies pinned (lockfile)no lockfile found

    A lockfile makes installs reproducible and resistant to silent dependency swaps.

    Fix: Commit a lockfile (package-lock.json / pnpm-lock.yaml / poetry.lock).

  • Warn
    Has a security policyno security policy

    A SECURITY.md gives a private path to report vulnerabilities.

    Fix: Add SECURITY.md with a disclosure contact and process.

  • Warn
    Adoption & popularitylimited adoption

    A small, capped nudge from stars/downloads — widely-used servers get more eyes on bugs. It can never offset a real security failure.

    Fix: Adoption grows naturally with real-world use; this never gates the score.

  • Pass
    No command-injection sinksguardno sinks found

    Untrusted tool input reaching a shell yields remote code execution.

  • Pass
    No dynamic code executionguardno sinks found

    eval()/exec()/Function() on tool-derived strings allows arbitrary code execution.

  • Pass
    No unsafe deserializationguardno sinks found

    pickle/yaml.load/etc. on untrusted data can execute code.

  • Pass
    No committed secretsguardno secrets found

    Hardcoded keys/tokens in published source are live credentials an attacker can use.

  • Pass
    Credentials sourced from environmentreads credentials from environment

    Reading secrets from env/secret stores avoids hardcoding them.

  • Pass
    Actively maintainedrecent commits

    Unmaintained servers don't receive security fixes.

  • Pass
    Repository not archivedguardactive

    Archived repositories will never be patched.

  • Pass
    Declares a licenseMIT

    A clear license is required for legal enterprise use.

  • Not checked
    No known-vulnerable dependenciesno lockfile found

    Runtime dependencies (parsed from the lockfile) are scanned against OSV.dev for published CVEs. Advisory: flagged dependencies lower the score but don't hard-cap it, since transitive reachability is unproven.

  • Not checked
    Signed releasesnot evaluated

    Signed releases let consumers verify artifacts weren't tampered with.

  • N/A
    No install/post-install scriptsguardno published package

    install hooks run arbitrary code on every consumer at install time.

  • N/A
    Package name not typosquattingguardno published package

    Names mimicking popular packages are a common malware delivery vector.

  • N/A
    Published with provenanceno published package

    Build provenance attests the artifact was built from the claimed source by CI.

  • N/A
    Established maintainerno published package

    Brand-new / single anonymous maintainers raise takeover and malware risk.

Transport & Trust Model

  • Warn
    Execution Sandboxingruns natively (no container image)

    A container/sandbox image limits blast radius; a server that runs natively has full host access.

    Fix: Ship a Dockerfile/Containerfile (or document a sandboxed run) so the server runs isolated.

  • Pass
    Transport Encryption (TLS)guardall remotes use HTTPS

    Plaintext HTTP exposes traffic and bearer tokens to interception.

  • Pass
    IAM / Authentication ScopingOAuth / PRM handling detected

    OAuth 2.1 / Protected Resource Metadata gates who can invoke tools.

  • Pass
    Network Exposureno bind-all detected

    Binding 0.0.0.0 or exposing debug inspectors widens the attack surface.

  • N/A
    Live Endpoint Reachablenot dynamically scanned

    A dynamic scan connected to the declared remote endpoint and it responded — verified live, not a dead URL.

  • N/A
    Authentication Enforced (live)not dynamically scanned

    If the server declares auth is required, it must actually reject anonymous clients. Serving tools to unauthenticated callers is a real exposure.

Tools (39)

reportentry_addwatch_addclient_addentry_editentry_listexport_csvsheet_findsheet_infosheet_readtimer_stopwatch_listclient_listinvoice_getinvoice_pdfprice_checksheet_querysheet_statssheet_writetimer_startbusiness_setentry_deleteinvoice_listtimer_statuswatch_removeclient_deleteprice_historysheet_convertwatch_refreshalerts_pendinginvoice_createoverdue_reportinvoice_summaryprice_add_manualproject_set_ratesheet_add_columnentry_mark_billedinvoice_mark_paidinvoice_from_hours