horizun-msproject-mcp MCP Server Security Report
Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.
Run it securely
Host io.github.HorizunGroup/horizun-msproject-mcp in a governed environment — SSO in front, every tool call attributed and audited.
Are you the maintainer?
Verify with GitHub to get alerted whenever HorizunGroup/horizun-msproject-mcp changes score — and claim the badge for your README.
Claim this serverThe short answer
- Is horizun-msproject-mcp safe to use?
- horizun-msproject-mcp scores 94/100 (grade A) on the Canopii Trust Index — strong posture. It passes 14 of the 21 security controls that apply to it, with no confirmed security failures.
- How reliable is the security score for horizun-msproject-mcp?
- We could evaluate 82% of the controls that apply to horizun-msproject-mcp. Scores are deterministic — the same source always produces the same score — and a partially-scannable server cannot present a high one, because confidence caps the result. The scanner is open source, so this score can be reproduced independently.
- How was horizun-msproject-mcp scored?
- Its published source was scanned against a fixed catalog of weighted security controls covering code safety, committed secrets, dependency vulnerabilities, tool-description integrity, authentication and transport, and maintenance. A confirmed flaw caps the score outright regardless of what else passes. The full rubric is published.
Security controlslatest scored version v1.6.1
Each control is evaluated deterministically with evidence. The score is earned from passing controls; a failed guard caps it.
Security controlslatest scored version v1.6.1
Each control is evaluated deterministically with evidence. The score is earned from passing controls; a failed guard caps it.
Model–MCP Runtime Guardrails
- PassIn-Session Definition Integrityguardno call-gated or call-time tool definition changes
Tool and prompt definitions stay fixed during a session — they don't change after a few calls, which is how runtime-gated rug-pulls slip past one-time review.
- Not checkedIndirect Prompt Injection (IPI) Defensesguardno tools extracted
Tool/prompt/resource text is free of hidden instructions that could hijack the agent.
- Not checkedStrict JSON Schema Enforcementno tool schemas found
Tool inputs are constrained (additionalProperties:false), so unexpected arguments can't be smuggled in.
- Not checkedUser-in-the-Loop / Approval Scopeguardno tools extracted
No over-broad or destructive tools (arbitrary shell, bulk-delete) that warrant human approval.
- N/ATool Definition Integrityguardno prior version to diff
Every consecutive version pair is diffed for new injection markers or destructive scope — a risky diff anywhere in history is a rug-pull (fail, durable); benign description drift warns.
Application Security Checks
- WarnDependencies pinned (lockfile)no lockfile found
A lockfile makes installs reproducible and resistant to silent dependency swaps.
Fix: Commit a lockfile (package-lock.json / pnpm-lock.yaml / poetry.lock).
- WarnAdoption & popularitylimited adoption
A small, capped nudge from stars/downloads — widely-used servers get more eyes on bugs. It can never offset a real security failure.
Fix: Adoption grows naturally with real-world use; this never gates the score.
- PassNo command-injection sinksguardno sinks found
Untrusted tool input reaching a shell yields remote code execution.
- PassNo dynamic code executionguardno sinks found
eval()/exec()/Function() on tool-derived strings allows arbitrary code execution.
- PassNo path traversalguardno sinks found
Naive path checks let tools read/write outside intended directories (EscapeRoute-class).
- PassNo SSRF sinksguardno sinks found
Fetching tool-supplied URLs can pivot into internal networks and metadata services.
- PassNo unsafe deserializationguardno sinks found
pickle/yaml.load/etc. on untrusted data can execute code.
- PassNo committed secretsguardno secrets found
Hardcoded keys/tokens in published source are live credentials an attacker can use.
- PassCredentials sourced from environmentreads credentials from environment
Reading secrets from env/secret stores avoids hardcoding them.
- PassNo known-vulnerable dependencies1 runtime deps, no known CVEs
Runtime dependencies (parsed from the lockfile) are scanned against OSV.dev for published CVEs. Advisory: flagged dependencies lower the score but don't hard-cap it, since transitive reachability is unproven.
- PassActively maintainedrecent commits
Unmaintained servers don't receive security fixes.
- PassRepository not archivedguardactive
Archived repositories will never be patched.
- PassDeclares a licenseMIT
A clear license is required for legal enterprise use.
- PassHas a security policySECURITY.md present
A SECURITY.md gives a private path to report vulnerabilities.
- Not checkedSigned releasesnot evaluated
Signed releases let consumers verify artifacts weren't tampered with.
- N/ANo install/post-install scriptsguardno published package
install hooks run arbitrary code on every consumer at install time.
- N/APackage name not typosquattingguardno published package
Names mimicking popular packages are a common malware delivery vector.
- N/APublished with provenanceno published package
Build provenance attests the artifact was built from the claimed source by CI.
- N/AEstablished maintainerno published package
Brand-new / single anonymous maintainers raise takeover and malware risk.
Transport & Trust Model
- WarnExecution Sandboxingruns natively (no container image)
A container/sandbox image limits blast radius; a server that runs natively has full host access.
Fix: Ship a Dockerfile/Containerfile (or document a sandboxed run) so the server runs isolated.
- PassNetwork Exposureno bind-all detected
Binding 0.0.0.0 or exposing debug inspectors widens the attack surface.
- N/ATransport Encryption (TLS)guardno remote endpoints
Plaintext HTTP exposes traffic and bearer tokens to interception.
- N/AIAM / Authentication Scopingno remote endpoints
OAuth 2.1 / Protected Resource Metadata gates who can invoke tools.
- N/ANo Token Passthroughguardno HTTP transport
The client's token is never forwarded to downstream APIs — the server obtains its own, correctly-scoped credential instead.
- N/ADNS-Rebinding Protectionno HTTP transport
HTTP endpoints reject requests carrying an unlisted Origin, so a malicious web page can't drive the server through the user's browser.
- N/ALive Endpoint Reachablenot dynamically scanned
A dynamic scan connected to the declared remote endpoint and it responded — verified live, not a dead URL.
- N/AAuthentication Enforced (live)not dynamically scanned
If the server declares auth is required, it must actually reject anonymous clients. Serving tools to unauthenticated callers is a real exposure.
Embed this score
Add the live badge to your README — it updates automatically on every rescan.
[](https://index.canopii.dev/server/io.github.HorizunGroup/horizun-msproject-mcp)<a href="https://index.canopii.dev/server/io.github.HorizunGroup/horizun-msproject-mcp"><img src="https://index.canopii.dev/api/badge/io.github.HorizunGroup/horizun-msproject-mcp" alt="Canopii Trust Score" /></a>Versions
Wondering how this compares? The MCP Security Index tracks grade distribution, committed secrets, and missing authentication across the whole ecosystem, refreshed monthly.